the demo before the reno September ’25
next:: p2 > p3 > p4 > p5 > p6 > p7 > p8
back :: p0>> p1 >
















old lathe and plaster work for ceiling over eastern living space where the old floorboards had made up the flooring.
modern ceiling over fireplace western space where there was a concrete slab floor and 1950s era linoleum tiles.
fun fact: at some point there had been an electrical fire in the cavity ceiling above light fitting on fireplace side
back to main page>> p1 > p2 > p3 > p4 > p5 > not yet p6 > p7 > p8